Why the permit matters
A permit puts the work on record and brings an inspector to look at it. For a repipe, that usually means checking the new piping, supports and connections, often while walls are still open and the system is under test pressure. It protects you by adding an independent check on the work.
Permits also matter later. Buyers, appraisers and insurers may ask whether major plumbing work was permitted. Unpermitted work can complicate a sale. The exact requirements, fees and inspection steps are set by the city, so this page tells you what to ask rather than what the answer is.
Where the permit usually fits
The order can vary. Confirm the actual sequence with the city and your plumber.
- Before work
- The contractor or owner applies for the permit with the city's building division.
- During rough-in
- New piping is installed and pressure tested with walls still open.
- Rough inspection
- An inspector may review the piping and test before walls are closed.
- After connection
- Fixtures are connected and the system is put back in service.
- Final
- A final inspection, if required, closes the permit.
What to confirm with the City of Fullerton
- Whether your scope, whole-house or partial, requires a permit.
- Which inspections are required and at what stage.
- Whether the owner or the contractor must be present.
- Any requirements for water heater connections or seismic strapping if the heater is touched.
- How to look up the permit status once it is issued.
Who usually handles what
- Permit application
- Usually the licensed contractor; confirm in writing
- Fees and rules
- Set by the city; check with the City of Fullerton
- License check
- cslb.ca.gov
- Water heater strapping
- Required for water heaters in California
Questions for your plumber about the permit
- Will you pull the permit, and is the fee in your quote?
- When will the inspection happen, and do I need to be home?
- What happens if the inspector requires a change?
- Will I get a copy of the finalized permit?
Common questions
Can I skip the permit to save time?
Skipping a required permit can cause problems with inspection, insurance or sale. Check with the city on what your project requires.
Who is responsible if the permit is not pulled?
The property owner can be affected. Agree in writing who will apply for it and confirm it was issued.
Does a partial repipe need a permit too?
It may. Ask the city about your specific scope.
General information for Fullerton, not a quote or professional advice. In an emergency, call 911.