About this example

This scenario is hypothetical. The bids and contractors are invented, and no prices are shown because this site does not quote them.

An owner receives two written repipe estimates. One total is much lower. Before choosing it, the owner fills in the quote comparison worksheet, one column per bid, using only what each estimate says in writing.

What the worksheet showed

Line itemBid ABid B
License checked at cslb.ca.govActiveActive
Material namedPEX, type and fittings listedNot specified
Fixture listRoom by roomNot listed
Main shutoff replacedYesNot mentioned
PermitIncludedNot mentioned
Patching and paintPatch, texture, paintDrywall patch only

What the owner did next

  1. Asked Bid B for detail

    Requested material, fixtures, valve and permit terms in writing.

  2. Compared revised bids

    Once the scopes matched, the gap between totals narrowed.

  3. Checked payment terms

    Confirmed both tied payments to completed stages.

  4. Decided on scope and fit

    Chose based on the complete written scope and how questions were answered.

Lessons from the example

  • Compare scope before totals.
  • Treat anything unwritten as not included until confirmed.
  • Ask each contractor to explain differences with the other bid.
  • Keep every revision in writing.

Common questions

Are these real bids?

No. Both bids are invented for illustration.

Is the lower bid always worse?

No. Once scopes match, a lower bid may just be lower. Compare the same job, then compare the totals.

Where is the worksheet?

See the repipe quote comparison worksheet on this site.